We’re only a few days away from opening our new Collierville campus. Thought you would enjoy a few pics. The auditorium stage is amazing and the Axis auditorium (still rough in the pic) will be soooo cool. I know we’re going to touch generations from that space. I’m a huge fan of the lobby with its massive windows. Love the bright flow for sure. It’s all so exciting. Don’t forget new service times this weekend:
Collierville: Sunday at 9:00a and 11:00a
Cordova: Saturday at 5:00p and Sunday at 10:00a and 11:45a
Jackson: Sunday at 10:30a
Leslie and I are so incredibly thankful to our amazing team working hard-core to get both Collierville and Jackson campuses ready for this mega wknd.



Hey this is Adam Bartlett! I am really excited about all that is going on at our new Collierville Campus. We have only been in the new building for one week and already we have made great progress. Throughout the next few weeks we’ll be posting updates here on the blog so check back often.
Here is a brief summary of the progress that we made last week outside of lots of general cleaning:
- There were two existing rear projection screens that we took down. Then we framed in the walls where those screens were and are getting ready to put up three front projection screens, just like in Cordova.
- The media team already have three new projectors in place and the cable is run!
- We lowered all of the existing speakers, including the subs, and are completely changing the layout of the speakers.
- We also lowered all of the existing theatrical lights for maintenance and will reposition them this week.
- A lot of work was completed outside in the woods behind the waterfall (yes, there is a waterfall!), picking up limbs and raking.
- Thanks to one of our facility team members, Dwayne Hawkins (Hawk Electric), we were able to get all of the exterior parking lot lights and two big flood lights working. The building looks amazing at night!
- We are completely transforming the new Axis Auditorium and started by completely gutting this room. I believe that this room is the room that is going to see the most transformation and am really excited to see how it’s going to turn out.
Tuesday night, January 26th, we’ll be having a work night at the new campus from 6-9p and would love for you to help. Continue to check out the blog for more updates to come!

I’m fired up about a new series I’m starting this weekend, ONE. Too often we think of “one” as insignificant, when really, there’s incredible potential in the power of one – one life, one decision or one idea can change the future forever. Together as one church united in one cause, we can make a difference that will last for eternity. It’s going to be a great series – you don’t want to miss a single weekend.
And don’t forget, all of our services are back in action this weekend from the holiday break. We’ve also got Wide Open on Sunday night at 6p at our Cordova Campus.
Cordova Campus – Saturday at 5p and Sunday at 8:45, 10:15 & 11:45a
Collierville Campus – Sunday at 10:30a at the Collierville YMCA
Jackson, TN Campus – Sunday at 10:30a